915, Apple Rdg, Allegan, MI, 49010
$377,000
3 beds
3 baths
1558 sq ft
Basics
- Date added: Added 2 days ago
- Category: Residential
- Type: Single Family Residence
- Status: Active
- Bedrooms: 3
- Bathrooms: 3
- Area: 1558 sq ft
- Lot size: 0.85 sq ft
- Year built: 2026
- Bathrooms Full: 2
- Lot Size Acres: 0.85 acres
- Rooms Total: 5
- County: Allegan
- Bathrooms Half: 1
- MLS ID: 26038604
Description
-
Description:
Newly constructed home nestled on a tree-lined lot in Schermerhorn Lake Preserve. Open plan features kitchen with island, granite and tile, and stainless appliances; dining area with a slider to deck; and living room. Primary bedroom with access door to main full bathroom, and second bedroom. Lower daylight level with laundry, utilities and storage, plumbed for a bathroom. Two-stall garage attached garage. Yard is finished to final grade, no seeding or landscaping.
Show all description
Building Details
- Building Area Total: 1378 sq ft
- Construction Materials: Vinyl Siding
- Architectural Style: Traditional
- Sewer: Septic Tank
- Heating: Forced Air
- Stories: 1
- Basement: Walk-Out Access
Amenities & Features
- Laundry Features: Main Level
- Flooring: Carpet
- Utilities: High-Speed Internet
- Parking Features: Garage Door Opener, Attached
- Garage Spaces: 2
- WaterSource: Well
- Interior Features: Broadband
- Lot Features: Wooded, Cul-De-Sac
- Fireplaces Total: 0
Fees & Taxes
- Tax Assessed Value: $603
- Association Fee Frequency: Annually
- Association Fee: $360
- Tax Year: 2025
- Tax Annual Amount: $30.67
- Association Fee Includes: Other
School Information
- High School District: Allegan
Miscellaneous
- Road Surface Type: Paved
- CrossStreet: Shermerhorn &. 34th
- Listing Terms: Cash, FHA, VA Loan, Conventional
Ask an Agent About This Home
This Single Family Residence style property is located in is currently Residential and has been listed on Tucker Benner Realty - Our Michigan Home. This property is listed at $377,000. It has 3 beds bedrooms, 3 baths bathrooms, and is 1558 sq ft. The property was built in 2026 year.